|
 |
Hotels, Casinos and Hospitality
|
| Coverage for Property Damage and Business Interruption |
| Honolulu, Hawaii, United States |
| 2005 - 2007 |
| Nature of Representation:
Insurance Recovery
|
| Nature of Representation:
Trials / Litigation
|
Represent international hospitality company in recovering on insured claims for property damage caused by defective construction.
|
| Turning Stone Casino |
| Verona, New York, United States |
| 2005 - 2007 |
| Nature of Representation:
Trials / Litigation
|
Changed work, delays and impact claims by and against owner, Sub-contractor, and insurance carriers arising out of the construction of a hotel and casino.
|
| MGM Grand's Cirque du Soleil KA Theater |
| Las Vegas, Nevada, United States |
| 2004 - 2007 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Nature of Representation:
Trials / Litigation
|
Represented owner in claims for delayed completion of theater.
|
| Luxor Hotel and Casino |
| Las Vegas, Nevada, United States |
| 2006 |
| Nature of Representation:
Trials / Litigation
|
Claims arising from defective construction.
|
| Embassy Suites Hotel |
| Washington, District of Columbia, United States |
| 2005 - 2006 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Nature of Representation:
Trials / Litigation
|
Represented general contractor in claims involving project owner and subcontractor.
|
| Commerce Club Hotel and Casino |
| Commerce, California, United States |
| 2004 - 2006 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Nature of Representation:
Trials / Litigation
|
Represented general contractor in delay, defect and disruption claims.
|
| Magic World Theme Park |
| Dubai, United Arab Emirates |
| 2001 - 2005 |
| Nature of Representation:
Arbitrations
|
| Nature of Representation:
Trials / Litigation
|
Represented design-build contractor against owner in UNCITRAL arbitration regarding payment disputes. Represented contractor in enforcing arbitration award against owner.
|
| Acqualina Ocean Residence and Resorts |
| Sunny Isle, Florida, United States |
| 2004 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
Builder's risk claims.
|
| Hyatt Resort |
| Orlando , Florida, United States |
| 2003 - 2004 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
Builder's risk claims.
|
| Grand Lakes Marriott Ritz-Carlton Resort |
| Orlando, Florida, United States |
| 2002 - 2004 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
Builder's risk claim.
|
| Chicago Peninsula Hotel |
| Chicago, Illinois, United States |
| 2001 - 2002 |
| Nature of Representation:
Trials / Litigation
|
Represented general contractor in claims against the owner for extras.
|
| Stanford Hotel Corporation |
| California, United States |
| 2000 - 2002 |
| Nature of Representation:
Mediations / Adjudications / DRBs / Negotiations
|
| Nature of Representation:
Trials / Litigation
|
Represented owner against multiple lien suits on multiple properties resulting from general contractor default.
|
| Mahantucket Pequot Tribal Nation’s Foxwoods Casino |
| Ledyard, Connecticut, United States |
| 1998 |
| Nature of Representation:
Construction, Engineering and Project Contracts
|
Negotiation and contract review for casino.
|
| Paris Casino and Resort |
| Las Vegas, Nevada, United States |
| 1997 |
| Nature of Representation:
Construction, Engineering and Project Contracts
|
Reviewed and revised on behalf of owner the guaranteed maximum price construction contract, with significant design-build elements.
|
| Canyon Ranch of the Berkshires |
| Massachusetts, United States |
| 1996 |
| Nature of Representation:
Construction, Engineering and Project Contracts
|
Drafted and negotiated contract on behalf of owner for conversion of a country manor into a resort and spa.
|
| Portman Hotel |
| San Francisco, California, United States |
| 1991 |
| Nature of Representation:
Trials / Litigation
|
Represented general contractor against claims of damage to adjacent properties resulting from construction of high-rise hotel.
|
| Ritz-Carlton Hotel Marina Del Ray |
| Los Angeles, California, United States |
| 1990 |
| Nature of Representation:
Arbitrations
|
Represented owner against contractor claims of wrongful termination.
|
| Liability Policy Audits |
| United States |
| Nature of Representation:
Insurance Recovery
|
Advise general contractor and construction manager on renewal of general liability program covering risk of defective construction.
|